Reference list

Download Reference List

LIST OF THE MAIN JOBS PERFORMED

The following is the list of the jobs that we performed worldwide.
Although we do our best to keep it updated we are constantly planning and performing new jobs, so please feel free to contact us for if you want the latest information on our activities.

Equipment & Description of the Job Client / Plant Period

UREA SYNTHESIS REACTOR

  • Relining of 6m of cylindrical area

  • Relining of bottom dome

  • Weld buildup of manway cover

  • Weld buildup of manway gasket seat

HP PROCESS PIPING

  • Replacement of ~30m of straight length of HP pipe, recovering the existing elbows, weldolets and branches

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah
Malaysia

February / March 2024

UREA SYNTHESIS REACTOR

  • Repair of liner welds and support welds

OMIFCO

Oman India Fertilizer Company SAOC
SUR
Sultanate of Oman

January / February 2024

UREA HP SCRUBBER

  • Fabrication and replacement of cylindrical internals

STAMICARBON B.V. /
LIBYAN FERTILIZER COMPANY #2
(LIFECO)

Marsa El Brega, Libya

November 2023

UREA SYNTHESIS REACTOR

  • Relining of 8.25 meters of cylindrical area

  • Relining of manway neck

  • Repair of liner

  • Repair of support cleats

PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau
VIETNAM

March / April 2023

AMMONIA PRIMARY REFORMER

  • Replacement of No. 288 Catalyst tubes

SOHAR INTERNATIONAL UREA AND CHEMICAL INDUSTRIES LLC

Port of Sohar
Sultanate of Oman

February / March 2023

No.1 BIMETALLIC HP UREA STRIPPER Unit 01

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

PHULPUR II Unit

Ghiyanagar, UP

INDIA

May / June 2022

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

AMMONIA PRIMARY REFORMER

  • Welding of Catalyst tubes

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

March / April 2022

UREA SYNTHESIS REACTOR

  • Opening of trays, inspection and repair of liner welds

  • Installation of No. 6 new SAIPEM Supercups® trays

HP PROCESS PIPING

  • Opening and box up of HP valves and flanges

  • Modification of HP lines to improve alignment and reduce leaks

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

March 2022

No. 2 BIMETALLIC HP UREA STRIPPERS Unit 31/41

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

PHULPUR II Unit

Ghiyanagar, UP

INDIA

January/February 2022

UREA SYNTHESIS REACTOR

  • Relining of top dome

  • Relining of 6 courses on cylindrical area

HP PROCESS PIPING

  • Replacement of No. 9 elbows

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

June / July 2021

UREA SYNTHESIS REACTOR

  • Relining of 12.4 meters of cylindrical area

  • Repair of liner

  • Installation of supports for new Supercups tray

BRANCH OF PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau

VIETNAM

April / May 2021

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

February / March 2021

TITANIUM AMMONIA CONDENSER

  • Remove of plugs

  • Partial retubing (68 tubes)

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

March 2020

TITANIUM STEAM CONDENSER

  • Removal of No. 5 tubes

  • Plugging of No. 5 + 5 holes

SABIC – Saudi Arabian Basic Company.

At

AR-RAZI

A SABIC AND JAPAN SAUDI ARABIA METHANOL COMPANY

AL JUBAIL

KINGDOM OF SAUDI ARABIA

March 2020

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair and replacement of tray supports

  • Repair of existing liner

OMIFCO

Oman India Fertilizer Company SAOC

SUR

Sultanate of Oman

February / March 2020

SOLID 25.22.2 HP STRIPPER

  • Modification of internals

  • Replacement of ferrules

HP CARBAMATE SEPARATOR

  • Repair

  • Relining

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

November 2019

UREA SYNTHESIS REACTOR

  • Relining of No. 2 courses

  • Replacement of No. 2 trays

  • Replacement of No. 2 elbows in the distributors

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / October 2019

UREA SYNTHESIS REACTOR

  • Partial relining

  • Repair

CASALE SA

At

TOGLIATTIAZOT

Togliatti

Russia

September / October 2019

UREA SYNTHESIS REACTOR

  • Replacement of neck liner and gasket seat on top manway

  • Relining of 5m

  • Repair of 100% of welds liner and tray supports

FERTILIZANTES NITROGENADOS VENEZUELA (FERTINITRO)

Barcelona

VENEZUELA

February / March 2019

UREA SYNTHESIS REACTOR

  • Installation of new SUPERCUPS® TRAY #18

PETROVIETNAM CAMAU FERTILIZER JOINT STOCK COMPANY

Ca Mau

Vietnam

August 2018

UREA SYNTHESIS REACTOR

  • Relining of 15.5m

CARBAMATE CONDENSER

  • Partial relining of channel

HP PROCESS PIPING

  • Modification

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

July / August 2018

UREA SYNTHESIS REACTOR

  • Relining of the area between tray #14 and bottom tangent line

  • Replacement of nozzle N1

CARBAMATE SEPARATOR

  • Rehabilitation

HP PROCESS PIPING

  • Repair and modification

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

April 2018

UREA SYNTHESIS REACTOR

  • Relining of top dome

  • Relining of 8.2 meters of cylindrical area

  • Repair of liner

BRANCH OF PETROVIETNAM FERTILIZER AND CHEMICAL CORPORATION

Phu My – Vung Tau

VIETNAM

November / December 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

KRIBHCO FERTILIZERS LTD.

PIPROLA,

Shahajahnpur, UP

INDIA

September / October 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

AONLA Unit

Bareilly, UP

INDIA

July/August 2017

UREA SYNTHESIS REACTOR

  • Complete replacement of titanium liner by cutting and re-welding the top portion of the pressure shell

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

March / July 2017

BIMETALLIC UREA HP STRIPPER

  • Shortening in-situ (without removing the stripper from its position)

  • Modification of the protrusion of tubes on the bottom tubesheet from 5mm to 18mm

  • Remaking of all bottom tube to tubesheet welds

IFFCO

Indian Farmers Fertilizer Co.

AONLA Unit

Bareilly, UP

INDIA

June / July 2016

UREA SYNTHESIS REACTOR

  • Removal and replacement of No. 1 liner course

  • Modification of carbamate inlet and solution outlet lines

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

May / June 2016

UREA SYNTHESIS REACTOR

  • Complete removal and replacement of titanium liner by cutting open the pressure shell

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

September / December 2015

SOLID 25.22.2 HP STRIPPER

  • Machining of the stripper tubes top end

  • Modification of the stripper ferrules

  • Design and fabrication of new grid

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / November 2015

UREA SYNTHESIS REACTOR

  • Second phase of relining

SOLID 25.22.2 HP STRIPPER

  • Supply of ferrules for Urea Stripper

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

September / November 2015

UREA SYNTHESIS REACTOR

  • Repair, modification and relining

HP PROCESS PIPING

  • Modification

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

May / June 2015

UREA SYNTHESIS REACTOR

  • Relining of 10.6m of cylindrical area.

CARBAMATE SEPARATOR

  • Rehabilitation

HP PROCESS PIPING

  • Repair and modification

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

April 2015

UREA SYNTHESIS REACTOR

  • Repair of titanium liner

CHITTAGONG UREA FERTILIZER LTD.

Chittagong, Bangladesh.

November / December 2014

UREA SYNTHESIS REACTOR

Item R501-2:

  • Replacement of all tray supports

  • Installation of new trays

  • Repair of liner welds

  • Relining of top dome

STATE COMPANY OF SOUTHERN FERTILIZERS – SCF

Khor Al Zubair

IRAQ

September / October 2014

UREA SYNTHESIS REACTOR

  • Second phase of relining – relining of lower half and bottom dome.

BANGLADESH CHEMICAL INDUSTRIES CORPORATION

At

JAMUNA FERTILIZER COMPANY LTD

TARAKANDI, JAMALPUR

BANGLADESH

June / July 2014

UREA SYNTHESIS REACTOR

Item R501-1:

  • Replacement of all tray supports

  • Installation of new trays

  • Repair of liner welds

  • Relining of top dome

STATE COMPANY OF SOUTHERN FERTILIZERS – SCF

Khor Al Zubair

IRAQ

May 2014

SOLID 25.22.2 HP UREA STRIPPER

  • Emergency repair

KOCH FERTILIZER CANADA, ULC.

Brandon (MB)

CANADA

December 2013

METHANOL CONVERTER

  • Repair and re-welding of 304H and Incoloy 800 tubes

OMAN METHANOL

Oman

December 2013

AMMONIA CONVERTER

  • Repair under Nitrogen blanket

PROMAN A.G.,

Germany

At:

CNC AMMONIA PLANT

Trinidad and Tobago

November 2013

CARBAMATE CONDENSER

  • Emergency repair

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

October 2013

TITANIUM HP UREA STRIPPER

  • Replacement of top channel

HP PROCESS PIPING

  • Modification – replacement of spools

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April 2013

UREA SYNTHESIS REACTOR

  • Relining of 10.6m of cylindrical area.

HP PROCESS PIPING

  • Replacement of reactor-o-stripper and carbamate separator-to-reactor line

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

November 2012

UREA SYNTHESIS REACTOR

  • Relining of 8m of cylindrical area

HP PROCESS PIPING

  • Modification, replacement of elbows and spools

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

September 2012

AMMONIA CONVERTER

  • Extensive repair

HP PROCESS PIPING

  • Partial replacement

KAFCO

Karnapuli Fertilizer Company LTD.

Chittagong

BANGLADESH

May 2012

TITANIUM HP UREA STRIPPER

  • Emergency repair of titanium liner

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

January / February 2012

UREA SYNTHESIS REACTOR

  • Relining of top dome and 8m of cylindrical portion

YARA ITALIA SPA

At

YARA ITALIA urea plant

FERRARA, Italy

May / June 2011

TITANIUM HP UREA STRIPPER

  • Relining of top channel

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April / May 2011

UREA SYNTHESIS REACTOR

  • Replacement of top manway liner and gasket seating ring

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

April 2011

ZIRCONIUM HP UREA STRIPPER

  • Inspection and repair.

PROFERTIL

Bahia Blanca

ARGENTINA

September

2010

UREA SYNTHESIS REACTOR

  • Relining of Urea Total Recycle Secondary Reactor.

KOCH FERTILIZER CANADA, ULC.

Brandon (MB)

CANADA

June / July 2010

UREA SYNTHESIS REACTOR

  • Relining of top dome and of 22.5 meters of the cylindrical portion.

  • Supply of bolts, nuts and washers for the sieve trays.

BANGLADESH CHEMICAL INDUSTRIES CORPORATION

At

JAMUNA FERTILIZER COMPANY LTD

Tarakandi, Jamalpur

BANGLADESH

April / May 2010

UREA SYNTHESIS REACTOR

  • Relining of the area included between tray #1 and tray #5.

  • Repair of liner welds.

HP PROCESS PIPING

  • Modification of high pressure piping for the installation of a new stripper.

BIMETALLIC HP UREA STRIPPER

  • Repair of the tube-to-tubesheet welds and the channel liner of the old stripper

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

February / March 2010

TITANIUM HP UREA STRIPPER

  • Repair of liner and tube-to-tubesheet welds and replacement of cover strips.

CHONGQING JIANGFENG CHEMICAL COMPANY

Baitao Town, Fuling District, Chongqing

CHINA

November 2009

UREA SYNTHESIS REACTOR

  • Supply and installation of top hoist.

  • Repair of liner welds.

  • Supply and installation of No. 5 new sieve trays.

  • Supply of material for overflow pipe.

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

August 2009

UREA SYNTHESIS REACTOR

  • Emergency repair of the liner welds.

 

PETRONAS CHEMICALS FERTILIZER KEDAH

Gurun. Kedah

Malaysia

December 2007 /

January 2008

UREA SYNTHESIS REACTOR

  • Replacement of the gasket seating ring on the manhole flange.

  • Relining of the top dome and 1.5 meters of the cylindrical portion.

  • Repair of liner welds.

  • Supply and installation of No. 9 new sieve trays.

BIMETALLIC HP UREA STRIPPER

  • Repair of tube-to-tubesheet welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama

BAHRAIN

November 2007

UREA SYNTHESIS REACTOR

  • Relining of 7.5 meters of the cylindrical portion between tray #5 and tray #9.

  • Supply and installation of load-limiting device for the top hoist.

TITANIUM HP UREA STRIPPER

  • Relining of the top channel.

SABIC Saudi Basic Industries Co.

At:

SAFCO IBN AL BAYTAR PLANT

Al Jubail

KINGDOM OF SAUDI ARABIA

June 2007

AMMONIA PRIMARY REFORMER

  • Re-design and replacement of No. 1 complete coil

  • Replacement of No. 2 headers and No. 1 row of finned tubes on a second coil

  • Replacement of No. 1 header in a third coil.

SOLID 25.22.2 HP STRIPPER

  • Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the high pressure flanges.

  • Supply of ferrules and ferrule stay grid for No. 2 strippers.

UREA SYNTHESIS REACTOR

  • Modification of gasket type from Delta to Cam Profile, with replacement of the gasket seating ring, on the manhole flange.

YARA ITALIA SPA

Ferrara

ITALY

October 2006

UREA SYNTHESIS REACTOR

  • Repair of tray supports

FERILIZANTES NITROGENADOS DE VENEZUELA (FERTINITRO)

Barcelona, VENEZUELA

October 2005

UREA SYNTHESIS REACTOR

  • Installation of load-limiting device in the reactor’s top hoist.

  • Installation of new liner strips over the existing liner at tray #13 and #14 elevation.

  • Repair of liner welds.

  • Replacement of overflow pipe.

H.P. PROCESS PIPING

  • Replacement of stub ends

BIMETALLIC H.P. UREA STRIPPER

  • Repair of bimetallic stripper tube-to-tubesheet welds.

GPIC

Gulf Petrochemical Industries Co.

Al-Manama, BAHRAIN

June 2005